Industrial – Nelson Construction & Development https://www.nelsonconstruct.com A design-build general contractor for commercial and industrial construction. Features project portfolio, testimonials, and client access area. Thu, 30 Sep 2021 20:30:37 +0000 en-US hourly 1 https://wordpress.org/?v=6.4.2 https://www.nelsonconstruct.com/wp-content/uploads/2021/10/cropped-favicon-32x32.png Industrial – Nelson Construction & Development https://www.nelsonconstruct.com 32 32 E 555 Parking Ramp https://www.nelsonconstruct.com/projects/e-555-parking-ramp/ Mon, 17 Sep 2018 23:50:54 +0000 http://ncd.local/?post_type=projects&p=1232 This new parking structure for the East Village of downtown Des Moines, Iowa is a truly unique urban design accomplishment. With Nelson assets e300 apartments and 430 East Grand adjacent to this site, Nelson went to work acquiring land from the City of Des Moines, as well as a neighboring church. This engineering marvel is carved into a hillside that takes advantage of natural grade changes to provide three levels of parking that do not connect with each other, allowing each level to act as a uniquely programmed use.

Floor one is leased by the City of Des Moines to provide hourly public parking. Floor two provides apartment residents in the neighborhood with a much-needed parking option. Floor three provides nearby office buildings with parking for their employees, as well as providing parking for the neighboring church congregation on evenings and Sundays.

]]>
Urbandale Business Center https://www.nelsonconstruct.com/projects/urbandale-business-center/ Thu, 03 Jul 2014 01:20:15 +0000 http://ncd.local/?post_type=projects&p=774 Urbandale Business Center is a 115,652 square foot warehouse that was completed in the fall of 1998. It houses Mid-American Energy and Scholastic Books. The building includes a high cube storage and pressured sprinkler system.

]]>
Plumb Supply Company https://www.nelsonconstruct.com/projects/plumb-supply-company/ Thu, 03 Jul 2014 00:40:11 +0000 http://ncd.local/?post_type=projects&p=755 Nelson Construction & Development started this 33,600 square foot warehouse expansion in September of 2006 and completed the project in January of 2007. Plumb Supply warehouse is a precast structure that in five months was constructed in phases to accomdate the owners’ ongoing operations, including the use of their new storage area just months after construction began.

The project consisted of ten foot wide by thirteen foot tall structural precast concrete wall panels and structural steel with interior spans of forty feet. The specialized dock equipment and “in floor” heating were interesting aspects in the construction.

Other aspects of the project included a specialized floor hardener for the interior concrete slab, office and restrooms at the receiving area, and the new storage area.

]]>
Jeld-Wen https://www.nelsonconstruct.com/projects/jeld-wen/ Thu, 03 Jul 2014 00:01:14 +0000 http://ncd.local/?post_type=projects&p=720 Nelson Construction & Development was hired by Jeld-Wen, a manufacturing company, to complete the design build services on a $7.7 million, multi-phase construction project in Grinnell, Iowa. The project scope contained a plethora of construction disciplines from office remodel and additions, major site utilities, and grading package to deep pile foundation and a 50,000 square foot factory structural steel infill addition to connect two facilities. This project was constructed while the existing plant remained in operation, producing doors seven days a week.

Much of the design and construction effort was spent working out cost efficient ways to remove multiple load-bearing masonry walls inside the existing “c” shape, 225,000 square foot building to create an open and efficient factory plan. It was also required to cut into the existing slab to create 19 equipment pits for equipment presses and other major equipment. In addition, 26 new overhead doors had to be cut in, along with loading dock pits, into an existing load bearing wall for Jeld-Wen’s new plant layout.

]]>
Science Center Parking Ramp https://www.nelsonconstruct.com/projects/science-center-parking-ramp/ Sun, 17 Mar 2013 17:21:22 +0000 http://www.fresksite.net/nelsonconstruct.com/?post_type=projects&p=62 Nelson Development worked with the Science Center of Iowa (SCI) and the City of Des Moines to construct a three-story parking garage to facilitate the long term parking needs for both the new $60 million Science Center of Iowa and this historic district of the City of Des Moines. The new garage is located north of Market Street, between Fourth and Fifth Streets, and incorporates the design requirements of the Court Avenue District and complements the design theme of the museum.

The Science Center of Iowa engaged Nelson Construction and Development to create a viable parking option for the 300,000 annual patrons. Nelson was charged with the responsibility of creating an efficient design that would accomplish four main goals:

• Allow enough parking without ‘hiding’ the magnificent SCI building.
• Make the structure cost efficient so the parking rates would be fair to their patrons.
• Meet and exceed the Court Avenue design standards as specified by the City of Des Moines’ newly adopted landscape standards for parking ramps.
• Expandability, the ramp can have two additional floors added if the need arises.

The ramp is a vital part in the success of the museum and why the SCI and the City of Des Moines made such a strong commitment to the project.

Nelson Development worked diligently to meet the need for open spaces for SCI visitors, volunteers and staff, as well as special events. In addition, it supports the patrons of the Downtown Farmers Market, future housing projects, I-Cubs Games, and the Arts Festival.

The ramp is designed to grow to five levels or approximately 500 spaces to meet the growing needs of the Science Center of Iowa’s growth and development.

]]>
Liberty Parking Ramp https://www.nelsonconstruct.com/projects/liberty-parking-ramp/ Sun, 17 Mar 2013 17:17:57 +0000 http://www.fresksite.net/nelsonconstruct.com/?post_type=projects&p=58 Nelson Construction and Development worked closely with the City of Des Moines to demolish a vacant eyesore of a building and replace it with a new, modern parking facility to serve the growing number of downtown mixed-use developments. The six-story parking facility includes 292 parking stalls and has access to the elevated skywalk system that connects downtown Des Moines.

The City of Des Moines asked Nelson to design a parking structure that looked more like an urban building than parking structure. The result is a design that creates the appearance of a continuous downtown office building with the functionality of a full-service parking garage. The benefits of this parking spaces are realized by multiple projects within a few blocks of its footprint.

Of the total parking spaces available, a portion are reserved for residential tenants of neighboring condominium projects, including 418 Liberty, others are rented to commercial office users, and many are used by the Hyatt Place hotel’s valet parking service.

The City of Des Moines recognized the need to improve its parking and the appearance of this area by including Tax Increment Financing in the development agreement to provide the developer with the assistance needed to assemble the land and building the project. The construction time was less than eight months from ground breaking to certificate of occupancy.

]]>
Chandler Airport Commerce Center https://www.nelsonconstruct.com/projects/chandler-airport-commerce-center/ Sun, 17 Mar 2013 17:13:53 +0000 http://www.fresksite.net/nelsonconstruct.com/?post_type=projects&p=50